Road Closures

◄ Back
September 17, 2021

TxDOT to begin BUS 59T pavement resurfacing

(This information is being shared on behalf of the Texas Department of Transportation)
As part of the Texas Department of Transportation’s BUS 59T resurfacing project, Hunter Industries will begin pavement milling operations on BUS 59T from Loop 463 to the Guadalupe River, starting at the Loop.
The contractor will conduct nighttime LANE CLOSURES 7 p.m.-6 a.m. Sundays through Thursdays beginning Sept. 19, weather permitting. The project is expected to last approximately three months.
Motorists should expect possible traffic delays and are urged to use caution when driving through the work zone. Motorists should keep the following tips in mind:
• Slow down and always follow posted work zone speed limits. Speeding is one of the major causes of work zone crashes. Remember, traffic fines double in work zones.
• Pay attention. Workers and heavy equipment may only be a few feet from passing vehicles.
• Be patient. Delays from roadway construction can be frustrating, but it only takes a few extra minutes to slow down for a work zone.
For more information, contact TxDOT at 361-573-9251.

Facebook Twitter Email